Shown in Figure five. typicaltypical for TRP, as confirmed information shown shown in 5. is also for TRP, as confirmed by the by the data in Figure Figure five. The dependencies of the phase shift angles harmonic frequencies were obtained for The dependencies in the phase shift angles at harmonic frequencies had been obtained The dependencies on the phase shift angles at at harmonic frequencies had been obtained for many types of nonlinear load (Figure 6). several kinds of nonlinear load (Figure 6). six). for different varieties of nonlinear load (FigureFigure six. Phase shift angles at 5th and 7th harmonics for UR, TR and TPR. Figure six. Phase shift angles at 5th and 7th harmonics for UR, TR and TPR. Figure 6. Phase shift angles at 5th and 7th harmonics for UR, TR and TPR.It may be seen from Figure 6 that the phase shift angles for the 5th and 7th harmonics It may be observed from Figure 6 that the phase shift angles for the 5th and 7th harmonics It from -seen from Figure six that the phase nonlinear loads. The and 7th harmonics is usually 85 to -120 varies from -85 to -120for for a variety of types of shift angles for the 5th minus sign that the varies different sorts of nonlinear loads. The minus sign indicates implies varies from -85 to of currentvarious varieties of nonlinear loads. The minusdirection of existing implies that the path -120for harmonics flow didn’t coincide together with the sign currentthat the path of existing harmonics flow did not coincide using the path of flow at path offundamental frequency through measurements. So, the obtained values of phase current harmonics flow didn’t coincide using the path of current flow at flowfundamental frequency for the duration of measurements. So, the obtained values of phase shift the in the the fundamental frequency throughout measurements. So, the obtained values of phase shift shift angles characterized the active-inductive load and were determined by the energyEnergies 2021, 14,eight ofsystem parameters in the harmonic frequencies. Within this case study, the Indisulam References connected further grid inductance was critical. As part of the experiment, a three Ohm resistance was connected Energies 2021, 14, x FOR PEER Overview eight of 1 towards the supply line alternatively of an further grid inductance. Within this case, the phase shift , that is standard for the resistive angles for the 5th and 7th harmonics had been about 180 character of the energy Risperidone-d4 custom synthesis program parameters and for the generation of harmonic currents angles characterized the active-inductive load as well as the determined by the of a in to the power program (from customer side to grid side). As a result, werephase parameters power program parametersfrequencies had been determined this the parameters in the power nonlinear load at harmonic at the harmonic frequencies. In by case study, the connected extra grid technique. It follows inductance was essential. As a part of the experiment, aload in resistance of current that when simulating an equivalent nonlinear three Ohm the kind was connected for the provide line as an alternative of an more grid inductance. Within this case, the phase shift angles fo sources, only their amplitudes may be specified. Within this case, the phase shift angles at the the 5th and 7th harmonics were about 180 which is common for the resistive character with the harmonic frequencies might be determined by the energy system model. As a result, only the power method parameters and for the generation of harmonic currents into the energy sys values of your current harmonic magnitudes had been compared with all the existing of a nonlinear load a tem.